A crew member holds a digital slate on a film set

Day Rates in Creative Work: 8, 10 and 12-Hour Days, Half Days, Overtime and Kit Fees

Some links below are affiliate links; buying through them supports the site at no cost to you.

A day rate is the number creative freelancers get asked for most and the one fewest of us can define. I’ve quoted mine as an editor and paid other people’s for my own studio, and the same misunderstanding shows up every time. One side hears a price for a day’s work. The other side hears a price for a day, and has a very specific idea of how long a day is. This page covers the definition, the day-length question, half days, overtime, turnaround, kit fees and daily versus weekly, with a converter in the middle so you can move your own number between units.

TLDR

A day rate is a flat price for one working day of a stated length, and the length is part of the price. Eight hours is the post-production default, ten is production, twelve is television, and the Unscripted TV Pay Rate Survey asks its daily-rate respondents which of those last two they mean. Half days bill at 50 percent when you split a day you’ve already sold and price at about 60 percent when you quote one from scratch. Overtime starts after 40 hours a week for most freelancers in the VFX Salaries sheet. Kit goes on its own line. Most TV work is quoted by the week. Write your day length down before anyone says a number.

What a day rate is, and what it is not

A day rate is a flat fee for one day of your work, where the length of the day is agreed in advance. You get the fee whether the job takes six hours or the full day. The client gets a known cost and a person who isn’t starting a stopwatch every time the notes change. You absorb the variance inside the day, they pay for the day.

What a day rate is not is your hourly rate times eight. Hourly billing and day billing carry different risk. An hourly editor gets paid for the extra ninety minutes when the notes land at 5 p.m. A day-rate editor already agreed those minutes were inside the day, or agreed they weren’t, which is the overtime question further down. Multiply an hourly number by eight and you’ve priced the day with no premium for carrying the overrun and no discount for the guarantee of a full day’s pay. Freelancers who do the straight multiplication later feel underpaid on long days and overpaid on short ones, and both feelings are correct.

How long is a day? 8, 10 and 12

In post-production an eight-hour day is the default assumption, and most of us treat the ninth hour as the start of a conversation. Production has never worked that way. A 10-hour day is standard on commercial and corporate sets, and 12 is normal on scripted and unscripted television, with the meal break sometimes inside the twelve and sometimes on top.

The Unscripted TV Pay Rate Survey, a community Google Sheet with 4,279 responses from 2017 through 2025, asks the respondents who report a daily rate whether that rate is for a 10-hour or a 12-hour day. It asks because a $700 day is a different hourly number depending on the answer, and a bare daily figure would mislead anyone reading the sheet. I’m not going to pull a split out of it; the point is that the question is on the form at all. In reality TV a day rate without a day length is incomplete information, and the survey treats it that way.

Photography and design borrow from both camps. A photo shoot day runs on a production clock, 10 hours and often more. A design or retouching day is an eight-hour desk day, like post. If you work across those worlds, quote one price with a stated length and an overtime rule attached. “Per 10-hour day, overtime at 1.5x after the tenth hour” leaves nothing for a producer to interpret, and a producer who can’t interpret can’t shave.

The converter below moves a number between hour, half day, day and week at whatever day length you set, with the overtime rule of your choice, and it uses the same rounding rules as the app I’m building: whole cents, one rounding per step.

A half day here is 50% of a day. A week is 5 days. On a day rate, working half the day length or less bills as a half day.

Half days: two conventions, both right

Half days are where day-rate arithmetic gets inconsistent, and not because anyone is wrong. There are two legitimate ways to think about one and you need both.

When you’re converting a rate you’ve already agreed, a half day is 50 percent of the day. That is the billing convention: if you booked a $900 day and the client releases you at lunch, the half is $450, and the converter above splits it that way.

When you’re pricing from scratch, a half day is worth more than half a day. A four-hour booking still costs you the setup or the commute, still blocks the morning from another client, and still comes with a brief, a handoff and an invoice. The planning side of the calculator prices a half day at 60 percent of the full day for that reason, and that is where I’d start when a client asks before anything is booked. Some freelancers go higher. Nobody who has done a few goes down to 50.

The two numbers don’t conflict. One answers “how do I split a day I’ve already sold,” the other “what should a short day cost.” The calculator page states both conventions beside its results.

Overtime

If the day is eight hours, what happens at hour nine? The VFX Salaries community sheet, 3,105 rows with a US-dollar hourly figure from 2018 through 2026, asks about overtime, and for most respondents it starts after 40 hours in a week rather than after a set number of hours in a day. For about a third of them, 10 to 15 percent of income is overtime, so it is a working part of the pay model in VFX and not a rounding error. Under a 40-a-week rule a 12-hour Tuesday isn’t overtime if Friday wraps at noon, and a supervisor who knows that will schedule accordingly.

Post-production day rates usually run the other way, with a daily threshold: eight hours at the day rate and 1.5x after the eighth, with production adding a doubling after the twelfth. Which rule you use matters less than putting it in writing before the first long day, because that is when the client discovers you have one. The converter takes a threshold and a multiplier so you can see what the extra hours are worth before you quote them.

Turnaround and minimum calls

Two production terms that post is slowly adopting. A minimum call is the shortest booking you’ll accept: a client who needs you for two hours pays for a half day or a full day, depending on where you set the floor. It protects the day you turned down to be available. In post, half-day minimums are the common form, and they matter most for client sessions rather than solo desk time.

Turnaround is the rest period between the end of one day and the start of the next. On set it is contractual: a wrap at midnight and a 6 a.m. call cuts into turnaround and triggers a penalty. In post there is rarely a clause, but the practice is the same: an overnight delivery after a full day is a second day or an overtime block, and the quote should already say so. Put the turnaround you expect in your terms; ten hours is a defensible figure, and a producer who sees it written down plans around it instead of testing it.

Kit fees

A kit fee is what the client pays for the equipment you bring, and it sits apart from your day rate on purpose. The day rate buys your time and judgement. The kit fee buys the use of gear you bought, insure, maintain and will replace: a camera package, lights and a sound kit on the production side; on the post side, a workstation that plays the timeline, a grading monitor, the storage the project lives on while it is with you, and the software seats.

Keeping it separate stops your day rate inflating to cover gear the client may not need on every job. It lets you charge the kit on days you aren’t there, the way a rental house does, when a drive sits with the project for a month. And it makes the quote legible: a producer comparing two editors can see that one is cheaper per day and more expensive once the suite is counted. If the client supplies the workstation and the storage, the kit line goes to zero and the day rate doesn’t move. That is the test for what belongs on the kit line: would it disappear if the client supplied the gear?

No kit fee numbers here. They depend on what you own and what the local rental house charges for the same thing, and the rental house is the reference, not another freelancer’s invoice.

Weekly versus daily

In television, almost nobody is paid by the day. In the Unscripted TV survey, 79 percent of respondents report a weekly rate and 13 percent a daily one. Weekly means a flat figure for a five-day week at the show’s day length, which is why the 10 versus 12 question matters even more there: the week is five of those days.

VFX freelancers split differently. The VFX Salaries sheet, in US dollars across its 2018 to 2026 rows, puts the freelance daily median at $370 from 259 responses and the weekly median at $1,789 from 69. Both are self-reported medians from a community sheet, not a rate card, and the two groups aren’t the same people, so don’t divide one by the other and call the result a rule. What the pair shows is that both units are in live use in VFX, and that the daily figure rests on the larger sample.

If the client books in weeks, quote the week and know your day so you can prorate a short one. If they book in days, quote the day with the length attached. Some freelancers discount the week against five single days for the certainty of a full booking. The converter does not; it treats a week as five days, and any discount is a decision you make on top of its number.

Set your own day length

Pick the day length your market uses, eight if you sit at a desk in post or design, ten if you shoot commercials or stills, twelve if you work in television, and say so in every quote. Attach an overtime rule. Decide your half-day floor, around 60 percent when you’re planning, and a minimum call. Put the kit on its own line. Then run your numbers through the day rate calculator, which plans a rate from what you need to take home and converts it at any day length. The video editor rates page has the survey figures with their years, populations and sample sizes, and how much should I charge walks the whole pricing question from the top.

And if you have a day rate and a day length, add them to our survey; the results go back to everyone who answers and ticks the box.

Total
0
Shares
Related Posts
Total
0
Share